Try it free

Quote Template: Free Fillable Form and a Worked Example

Driveway Desk team 2 November 2026 10 min read

Start your first quote

Gloved and bare hands holding a phone with a dark screen above the wet hood of a grey work van, a tape measure on the hood, in a residential driveway

A quote template is a one-page form that turns a job you have already looked at into a fixed price the customer can say yes to: your details, the customer and job address, a quote number and expiry date, the scope with exclusions, line items, tax, deposit and an approval line. Fill in the free template below on your phone, download the PDF and send it before you leave the driveway.

Short answer

A good quote lists the scope and what is excluded, priced line items, tax, a deposit, a total and an expiry date, plus a line for the customer's approval. Fill in the template on this page and save it as a PDF.

Most free quote templates look tidy and protect nothing. The exclusions line, not the total, is what keeps a fixed price fixed. A customer who read "price assumes the existing shutoff valves turn off" before you started accepts the extra $40 when one snaps. A customer who never saw that line argues about it.

Fill in the free quote template

The template works in your browser. Pick a trade preset to load starting line items, then replace them with the job in front of you: quantities, your own unit prices, a tax rate if it applies and a deposit. The total updates as you type. Download the PDF or print it, then send it the way you normally reach the customer.

Nothing is saved after you close the tab, so download first. The preset wording is a starting point, not a suggested price; every amount should come from your own rates.

Use this template

Your entries stay in this browser tab. Download or print before leaving; this page does not save your document.

Line items

Document preview

Quote template

Business name:

Business contact:

Customer name:

Customer contact:

Job address:

Document reference:

Document date:

Quote expiry date:

Terms and exclusions: Work includes only the listed scope. Additional work requires written approval.

Service: Standard cleaning visit

Blank form on a clipboard on the open tailgate of a work van with a tape measure, pencil and worn work gloves, rain-wet street behind
A blank form and a tape measure: where most small-job quotes start

What goes on a quote

A complete quote answers three questions: what exactly you will do, what it costs, and how long that price holds. Everything else identifies the job or records the yes. Here is every field and a real entry from the worked example below.

Field Why it matters Example entry
Your business name and contact The customer needs to reach you to approve Name, phone, email, license number if your state issues one
Customer and job address The price applies to one property 22 Birch Ln, kitchen
Quote number and date Matches revisions to the final invoice Q-1107, Nov 2
Expires on Parts prices move; old numbers should die 30 days from the date
Scope What the price covers, in plain words Remove old kitchen faucet, install new pull-down faucet
Exclusions What the price does not cover Seized shutoff valves, cabinet floor repair
Labor lines Hours and rate, or a flat task price 2 hr x $85, faucet swap
Materials lines Parts with quantities 2 braided supply lines at $12 each
Tax Taxable items vary by state The rate that applies to you
Deposit Commits the customer and covers parts $213 at approval
Approval Turns the quote into a go-ahead Signature or written reply with date
Diagram of a one-page quote with labeled callouts for business, customer and address, quote number and expiry, scope and exclusions, line items, tax, deposit and approval
Eight fields every quote needs

The field most owners skip is the expiry date. Without it, a customer can call in April holding a November number. Thirty days is a sane default for small residential jobs; match it to how long your supplier holds prices.

Quote or estimate: which one are you sending?

A quote is a fixed price for a defined scope. An estimate is your best calculation when part of the job is hidden. Send the one that matches what you actually know, not the one that sounds more professional.

Document Send it when How the price behaves
Quote You have seen the whole job and done it before One price for the stated scope; changes need a new agreement
Estimate Something is hidden: inside walls, under floors, old fixtures Expected cost, often a range, with written assumptions
Invoice The work is done The amount owed, matched to the approved quote

When the walkthrough leaves real unknowns, use the estimate template with a price range instead. Whether either document binds you depends on its wording and your state's rules, so do not lean on the title alone.

Hands in navy workwear holding a yellow tape measure along the top of an old green bathroom vanity cabinet
Measure before you write a number, even on a small swap

How to write a quote that gets approved

How to write a job quote

  1. Walk the job and measure

    Look at everything the price depends on: access, the condition of what you are replacing, parking, what is behind the access panel. Measure before you write a number.

  2. Write the scope, then the exclusions

    Describe the result in the customer's words. Then list what is not included and what would change the price. One line per exclusion. Painters get the same protection from "two coats, same color, trim not included" on a painting job bid.

  3. Price each line from your own numbers

    Labor from your real hourly cost plus margin, materials at your cost plus your markup. Never copy a national average into a line.

  4. Add tax, deposit and expiry

    Apply the tax rate that fits your state and the items on the quote. Set a deposit that at least covers parts, and an expiry date.

  5. Send it the same day

    Download the PDF and send it while the customer still remembers your visit. Then follow up once, two or three days later.

Your labor line should come from what an hour actually costs you, not what the guy down the road charges. The labor cost calculator works that out from wages, payroll costs and billable hours. For parts, the markup and margin calculator shows why a 30% markup is not a 30% margin.

Boxed pull-down kitchen faucet, two braided supply lines, plumber tape and an adjustable wrench on a grey drop cloth
Every part on the quote gets its own line

Worked example: a kitchen faucet swap

Here is a real handyman job priced line by line. The rates are example inputs, not a market survey: use your own.

Line Quantity Unit price Amount
Remove old faucet, install new pull-down faucet 2 hr $85.00 $170.00
Pull-down kitchen faucet, mid-range 1 $189.00 $189.00
Braided supply lines 2 $12.00 $24.00
Haul away old fixture 1 $15.00 $15.00
Subtotal $398.00
Tax at an example 7% $27.86
Total $425.86
Deposit at approval (covers parts) $213.00
Balance due on completion $212.86

Exclusions on this quote: replacing seized shutoff valves ($40 each if needed, quoted on site), repairs to a water-damaged cabinet floor, and any countertop drilling. The deposit equals the parts cost, so a customer who cancels after you bought the faucet has not left you holding it. The template applies one tax rate to the whole subtotal; if your state taxes labor and materials differently, split them on separate quotes or check with your state. The SBA keeps a state-by-state starting point for sales tax.

Stacked bar chart of the kitchen faucet quote: labor 170, faucet 189, supply lines 24, disposal 15, tax 27.86, total 425.86, split into a 213 deposit and 212.86 balance
The worked quote, line by line

If you are pricing a list of small jobs like this one, the handyman price list shows the per-task math for the most common calls.

Mistakes that cost you on a quote

  • No exclusions. The customer assumes everything nearby is included. You do the extra work for free or lose the review.
  • No expiry date. A six-month-old quote comes back at last year's parts prices.
  • One lump sum. "Faucet install: $425" invites haggling. Line items show where the money goes and make the price look earned.
  • No deposit on parts-heavy jobs. You buy the faucet, the customer changes their mind, and the faucet lives in your van.
  • Sending it tonight instead of today. A quote written at the kitchen table at 9 pm reaches a customer who already called someone else.
Handyman kneeling at an open kitchen sink cabinet, gloved hands tightening a supply line with a wrench, bucket nearby
Exclusions cover what you find under the sink

When a template stops being enough

A template is fine for a few quotes a week. The wall comes when you are re-typing the same $85 rate and the same supply-line price on every job, then digging through your phone's downloads to find which version the customer approved. Once the quote is approved, the job also has to move onto a work order for the crew, then an invoice, and every handoff is more typing.

That is the wall Driveway Desk is built for: your price book remembered, a quote drafted from it on your phone in the driveway, approval and deposit online, then the same lines carried to the invoice and paid into your own Stripe or Square account. If you are weighing it against the big names, the Jobber plan breakdown shows what each tier costs.

Six-step flow diagram from walkthrough to quote, approval and deposit, job, invoice and paid
One job, from walkthrough to paid

Price it once, then start your first quote from the driveway next time.

Start your first quote

Price it once, then start your first quote from the driveway next time.

Before you hit send

Read the exclusions line as if you were the customer. If they could not check it on site, rewrite it until they could. Then confirm the expiry date, the deposit and the total, and send the PDF the same day you saw the job. Your prices, remembered. Build your first quote on your phone in about two minutes, send it, and get paid into your own account.

Frequently asked questions

How do you create a quotation?

Walk the job, write the scope and exclusions, price each line from your own labor and material costs, add tax, a deposit and an expiry date, then send it the same day. The template on this page lays out every field so you only fill in the numbers.

Where can I find free quotation templates?

Use the template on this page without creating an account. Pick a trade preset, replace the sample lines with your own quantities and prices, and download the PDF before you close the tab.

How do I create a quote template in Excel?

Make columns for description, quantity, unit price and amount, with amount as quantity times unit price. Add a subtotal, a tax cell as subtotal times your rate, a total, a deposit and a balance. This page produces a PDF rather than a spreadsheet, so keep your own workbook if you need editable formulas.

Is a quote the full price?

A quote is the full price for the scope it describes. Anything outside that scope, such as the exclusions you listed, is extra and needs a new agreement before you do it. That is why the exclusions line matters as much as the total.

Is there a legal difference between a quote and an estimate?

Generally a quote is treated as a firmer commitment than an estimate, but how binding either one is depends on its wording and your state's rules. Write exactly what the price covers and how changes are handled rather than relying on the document's title.

Do quotes need to be exact?

The price for the stated scope should be exact; that is the point of a quote. If you cannot see enough of the job to commit to one number, send an estimate with a range and written assumptions instead.

Your prices, remembered.

Build your first quote on your phone in about two minutes, send it, and get paid into your own account.

Start your first quote

About the author

Driveway Desk team

Field notes team

We write practical guides for home service crews of one to five. Our editorial standard is to show the calculation, state its assumptions, cite primary sources for factual claims and date competitor comparisons. We distinguish worked examples from market prices and correct errors when they are found. We do not claim trade licenses or credentials on behalf of the team.

More articles

Field service software for crews of one to five.

Try it free